
Historic Home Renovation Debris Cleared in Record Time
The Challenge
The morning we got the call, the homeowner was standing knee-deep in plaster dust and broken lathe from their 1920s bungalow renovation. With Orlando City Hall inspections scheduled the following week, they needed every scrap of debris gone before the inspector's arrival. The clock was ticking.
The Result
Our crew rolled in with two 20-yard dumpsters and had them filled by lunchtime. We separated the old-growth lumber for recycling and kept the dust contained with our tarp system. The homeowner passed inspection with room to spare.
You turned our disaster zone into a clean slate overnight.
Marcus T., Holden-Parramore resident
